(1)
Prativi, A.; Astuti, S. W.; Ependi, A. Application of Prefabricated Vertical Drain (PVD) for Basic Soil Stabilization in the Railway Double Track Construction Project at Km 437 + 300 to Km 438 + 500 Gombong, Kebumen. JPI 2019, 3 (1). https://doi.org/10.37367/jpi.v3i1.61.