[1]
A. Prativi, S. W. Astuti, and A. Ependi, “Application of Prefabricated Vertical Drain (PVD) for Basic Soil Stabilization in the Railway Double Track Construction Project at Km 437 + 300 to Km 438 + 500 Gombong, Kebumen”, JPI, vol. 3, no. 1, May 2019, doi: 10.37367/jpi.v3i1.61.