1.
Prativi A, Astuti SW, Ependi A. Application of Prefabricated Vertical Drain (PVD) for Basic Soil Stabilization in the Railway Double Track Construction Project at Km 437 + 300 to Km 438 + 500 Gombong, Kebumen. JPI [Internet]. 2019 May 31 [cited 2026 Jun. 4];3(1). Available from: https://jurnal.ppi.ac.id/jpi/article/view/61