Vol. 3 No. 1 (2019): Jurnal Perkeretaapian Indonesia Volume 3 Nomer 1 Tahun 2019
Articles
-
Application of Prefabricated Vertical Drain (PVD) for Basic Soil Stabilization in the Railway Double Track Construction Project at Km 437 + 300 to Km 438 + 500 Gombong, Kebumen
Abstract view : 1236 times |
Download: 1685 times |
DOI : https://doi.org/10.37367/jpi.v3i1.61
-
Prototype of Railway Passenger Warning System Based on Arduino Uno Atmega 328 Microcontroller
Abstract view : 947 times |
Download: 1239 times |
DOI : https://doi.org/10.37367/jpi.v3i1.62
-
Modeling of Atmega 2560 Microcontroller-Based Train Passenger Counter
Abstract view : 1252 times |
Download: 2517 times |
DOI : https://doi.org/10.37367/jpi.v3i1.66
-
Comparison of Curved Radius Measurement Using Yarn, Total Station and Messreg CLS
Abstract view : 1081 times |
Download: 4514 times |
DOI : https://doi.org/10.37367/jpi.v3i1.67
-
Customer Perceptions and Expectations of the Quality of Soekarno-Hatta Airport Railway Services
Abstract view : 1061 times |
Download: 1209 times |
DOI : https://doi.org/10.37367/jpi.v3i1.68
-
Analysis of Electric Railroad Trips on the Manggarai - Bogor Line
Abstract view : 974 times |
Download: 3086 times |
DOI : https://doi.org/10.37367/jpi.v3i1.69
-
Locking Crossing Door Locking Design Type Pln-Power Operation Manual Using Electromagnet
Abstract view : 1057 times |
Download: 1443 times |
DOI : https://doi.org/10.37367/jpi.v3i1.71
-
The stability of the Corrugated Concrete Sheet Pile (CCSP) of the Soil Retaining Wall at the Abutmen Bridge Bh 1751 in Lok Ulo District, Kebumen
Abstract view : 1168 times |
Download: 3225 times |
DOI : https://doi.org/10.37367/jpi.v3i1.72
-
Analysis of Monthly Maintenance Performance (P1, P3, P6) Commuter Line Dipo Depok
Abstract view : 1177 times |
Download: 3440 times |
DOI : https://doi.org/10.37367/jpi.v3i1.73
-
Optimizing Train Maintenance to Minimize Maintenance Delays at Balai Yasa Manggarai
Abstract view : 925 times |
Download: 1955 times |
DOI : https://doi.org/10.37367/jpi.v3i1.74