Manufacture of Hydraulic-Based E-Clip Mounting And Removing Auxiliary Tools

Authors

  • Dadang Sanjaya Atmaja Politeknik Perkeretaapian Indonesia Madiun
  • Henry Widya Prasetya Politeknik Perkeretaapian Indonesia Madiun

DOI:

https://doi.org/10.37367/jpi.v5i2.157

Keywords:

maintenance, e-clip fastening, hydraulic.

Abstract

Maintenance of the mooring system is an effort to keep the moorings on the railroad tracks in good condition. Installing and removing fastenings in Indonesia uses manual tools, namely hammers and panpullers so that it takes a long time and is less effective, so the development of the tool is aimed at minimizing the use of human labor, being more effective and not requiring a lot of time to install and remove fasteners. In this final project, the manufacture of a hydraulic-based fastening installation and release tool is carried out with the development of an old tool with a new tool. The hydraulic-based fastening installation and removal tool have a length of 105 cm, a width of 67 cm and a height of 91 cm which is able to minimize the use of human labor and is more effective in installing and removing the fasteners. The use of these tools by placing the tool on the rail and positioning the hydraulic cylinder in front of the fasteners, then pump using the hydraulic pump lever until the fasteners can be attached or removed. From the results of the development of this tool, it can be seen that the installation and removal of fasteners can be done by minimizing human labor and requires an effective time of 50 seconds.

Downloads

Download data is not yet available.

References

Peraturan Dinas Nomor 10. (1986). Perencanaan Konstruksi Jalan Rel. Peraturan Dinas Nomor 10. PT. Kereta Api Indonesia.

Peraturan Menteri Perhubungan Nomor 32 (2011). Tentang Standar & Tata Cara Perawatan Prasarana. Lembaran Negara RI Tahun 2011 Sekretariat Negara. Jakarta.

Perwira, D.A. & Prasetya, H.W. (2020). “Pengaruh Variasi Bentuk Permukaan Forging dan Suhu Preheat Terhadap Kekuatan Tarik Friction Welding”. Jurnal V-Mac, Vol.5 No.2: 47-49.

Putriningtyas et al, 2007. “Pembuatan Press Hidrolik untuk Pengambilan Minyak dari Biji-Bijian”. Universitas Sebelas Maret. Surakarta.

Rais, Nasrullah, M.Q., Murwono D., (2007). Analisis volume pemeliharaan tahunan jalan rel berdasarkan Passing Tonnage dan klasifikasi jalan kereta api. Studi kasus Lintas Yogyakarta-Solo. Universitas Gajah Mada. Yogyakarta.

Sumbowo, Pamulung H., (2008). Evaluasi Sistem Perawatan Jalan Rel Lintas Stasiun Kutoarjo – Stasiun Tugu. Program Studi S2 Mag. S. & T.Transportasi. Universitas Gajah Mada.

Surakim, H., (2014). Konstruksi Jalan Rel Dan Keselamatan Perjalanan Kereta Api. Nuansa Cendekia. Bandung.

Utomo, Tri S.H., (2006). Struktur Rekayasa Jalan Rel. Beta Offset Yogyakarta.

Undang-Undang Nomor 23. (2007). Tentang Perkeretaapian. Lembaran Negara RI Tahun 2007. Sekretariat Negara. Jakarta.

Downloads

Published

2021-11-30

How to Cite

Atmaja, D. S., & Prasetya, H. W. (2021). Manufacture of Hydraulic-Based E-Clip Mounting And Removing Auxiliary Tools. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 5(2), 22–31. https://doi.org/10.37367/jpi.v5i2.157

Issue

Section

Articles

Most read articles by the same author(s)

Similar Articles

1 2 3 > >> 

You may also start an advanced similarity search for this article.