Calculation of Effectiveness of Traction Substation for Commuter line Cross Manggarai - Bogor

Authors

  • Mariana Diah P. PPI Madiun
  • feby Wiratama Putra

DOI:

https://doi.org/10.37367/jpi.v3i2.104

Keywords:

Gardu KRL, Gardu Traksi, Kapasitas Gardu, Kereta Rel Listrik

Abstract

Commuter line in PT Kereta Commuter Indonesia (KCI) is a means of transportation that transports passengers in Jabodetabek. In the Bogor-Manggarai crossing, several Traction substations are supplied. This study aims to find out how the capacity of substation power capacity in Bogor - Manggarai crossing towards the loading of the current Commuter line operating pattern and how the capacity of substation carrying capacity to increase the loading of KRL operating patterns at peak hour. For this reason, primary and secondary data are analyzed using the calculation formula. Among them: total Commuter line weight, tractive substation power capacity in the Manggarai-Bogor crossroad, power capacity based on headway, power capacity based on maximum current, required capacity, and cross capacity used on multiple lines. It can be concluded that the capacity of the cross-Manggarai-Bogor electric power in the normal 4-minute headway according to GAPEKA 2017 can be fulfilled by the Bojonggede Traction Station. And at peak hours conditions Bojonggede Traction substation can support with 3.75 minutes headway and can be reduced to 3 to 2 minutes.

Downloads

Download data is not yet available.

References

Anggraeni, D. (2017). Perhitungan Kapasitas Daya Gardu Listrik pada Gardu Traksi Tanah Abang baru guna persiapan pengoperasian KA Bandara Soekarno - Hatta. 1 - 7.

Badan Pengembangan SDM Perhubungan. (2014). Modul Perencanaan Perjalanan Kereta Api - II. Jakarta.Putri, A. R. (2018). Analisa Daya Dukung Gardu Traksi Kranji pada pengoperasian Kereta Bandara Soekarno - Hatta. 1 - 7.

BPS. (2019). Jumlah Penumpang Kereta Api, 2006-2019 (Ribu Orang). 2019, agustus 14. diakses dari www.bps.go.id: https://www.bps.go.id/linkTableDinamis/view/id/815

Direktorat Pengelolaan Prasarana. (2017). Standar Operasional Prosedur Pelaksanaan Tugas dan Tanggung Jawab Pemeriksaan dan Perawatan STE. Bandung.

Dwiatmoko, H. (2016). Pengujian Fasilitas Operasi Kereta Api. Jakarta.

Kumparan.com. (2019, agustus 10). PT KCI Berfokus Menambah KRL Rangkaian Panjang untuk Tingkatkan Daya Angkut Hingga 2020.. Diambil kembali dari kumparan.com:https://kumparan.com/masajeng-rahmiasri/pt-kci-berfokus-menambah-krl-rangkaian-panjang-untuk-tingkatkan-daya-angkut-hingga-2020

Pemerintah Indonesia. (2007). Undang-Undang No. 23 tahun 2007 tentang Perkeretaapian. Jakarta : Sekretariat Negara.

Pemerintah Indonesia. (2018). Peraturan Menteri Perhubungan PM No. 50 Tahun 2018 tentang Persyaratan Teknis Instalasi Listrik Perkeretaapian. Jakarta : Kementerian Perhubungan

PT KAI. (2017). Grafik Perjalanan Kereta Api (GAPEKA) 2017. Jakarta: PT KAI.

Qolbina, E. S. (2017). Optimalisasi Daya Gardu Traksi Cakung dengan peningkatan jumlah KRL pada lintas Bekasi - Jatinegara. 1 - 7.

Saputra, A. (2019). Studi Evaluasi analisa Perhitungan Daya Gardu Traksi terhadap kebutuhan KRL jalur Manggarai Depok. 1 - 8.

Downloads

Published

2019-12-04

How to Cite

P., M. D., & Putra, feby W. (2019). Calculation of Effectiveness of Traction Substation for Commuter line Cross Manggarai - Bogor. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 3(2). https://doi.org/10.37367/jpi.v3i2.104

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.