The Effect of Additional Lines on Long Distance Rail Operations
DOI:
https://doi.org/10.37367/jpi.v6i1.196Keywords:
geometri, lengkung horizontal, kecepatanAbstract
Line 5 of the Bekasi Station Emplacement is a new line from the addition of a Double Double Track at the Bekasi Station Emplacement which will later be used as a direct train line with a maximum speed of 100 km/hour. The existence of 10 fixed curves and 2 temporary arches on line 5 needs to be evaluated for feasibility so that it can be crossed by trains at high speed. The evaluation is carried out in the form of an evaluation of the horizontal curve geometry which includes the evaluation of the minimum radius, rail elevation, the value of the bow arrow, and the allowable operating speed of the train. In addition, periodic maintenance plans can also be determined based on the analysis carried out on the horizontal bending radius. This evaluation is based on the Minister of Transportation Regulation No. 60 of 2012. From the evaluation for curves crossed by a train with a speed of 100 km/hour, all curves still meet the minimum radius requirements. While the 2 temporary arches are used to limit the speed of the train during the construction of the line, which will later be dismantled. In the evaluation of rail elevation all arches are eligible for outer rail elevation. Furthermore, an analysis of the actual value of bow arrows is also carried out in the field. From the analysis carried out, the arc needs to be adjusted to the specified arrow value.
Downloads
References
“Permenhub No. 60 Tahun 2012 tentang Persyaratan Teknis Jalur Kereta Api [JDIH BPK RI].” https://peraturan.bpk.go.id/Home/Details/147069/permenhub-no-60-tahun-2012.
M. Sholihin, H. Dwiatmoko, and D. Septanto, “Curved Treatment in Km 2 + 2/400 Manggarai - Jatinegara Cross,” J. Perkeretaapi. Indones. Indones. Railw. J., vol. 4, no. 1, Mar. 2020, doi: 10.37367/jpi.v4i1.124.
W. A. Wirawan, H. B. Wahjono, and F. Rozaq, “Desain Prototype Teknologi Automatic Surface Treatmen Untuk Meningkatkan Ketahanan Jalan Rel Kereta Api,” J. Perkeretaapi. Indones. Indones. Railw. J., vol. 4, no. 1, Mar. 2020, doi: 10.37367/jpi.v4i1.98.
R. Fajriati, S. H. T. Utomo, and I. Muthohar, “Analisis Standar Perancangan Geometri Rel Kereta Cepat (Studi Kasus : Kereta Cepat Jakarta - Bandung),” J. Manaj. Aset Infrastruktur Fasilitas, vol. 4, no. 3, Art. no. 3, Jul. 2020, doi: 10.12962/j26151847.v4i3.7104.
M. F. Azis, D. Aprisandi, and M. K. Abadi, “PERANCANGAN STRUKTUR JALAN REL ANTARA STASIUN CIGADING - STASIUN ANYER KIDUL,” J. Sustain. Civ. Eng. JOSCE, vol. 3, no. 02, Art. no. 02, Aug. 2021, doi: 10.47080/josce.v3i02.1447.
D. Oleh and V. Pebiandi, “PERENCANAAN GEOMETRI JALAN REL KERETA API TRASE KOTA PINANG – MENGGALA STA 104+000 – STA 147+200 PADA RUAS RANTAU PRAPAT – DURI II PROVINSI RIAU,” p. 21.
C. P. Adi, E. I. Sukmajati, S. Hardiyati, and S. P. R. Wardani, “Perencanaan Jalur Ganda (Double Track) Jalan Rel Ruas Semarang – Gubug,” J. Karya Tek. Sipil, vol. 2, no. 3, Art. no. 3, Aug. 2013.
H. Surakim, Konstruksi Jalan Rel dan Keselamatan Perjalanan Kereta Api, Nuansa Cendikia: Bandung. 2014.
T. A. Karyanto, A. T. Handayani, and V. D. A. Anggorowati, “EVALUASI PENGARUH LENGKUNG JALAN KERETA API TERHADAP KECEPATAN KERETA API:,” Equilib, vol. 1, no. 1, Art. no. 1, Jul. 2020.
“JDIH | Kementerian Perhubungan.” http://jdih.dephub.go.id/produk_hukum/view/VUUwZ016SWdWRUZJVlU0Z01qQXhNUT09 .
S. Haris and T. Hendrianto, “PENGARUH GEOMETRIK JALAN REL TERHADAP BATAS KECEPATAN MAKSIMAL KERETA API,” J. Online Sekol. Tinggi Teknol. Mandala, vol. 12, no. 2, Art. no. 2, 2017.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal)
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
The Authors submitting a manuscript do so on the understanding that if accepted for publication, the copyright of the article shall be assigned to Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal).