Reactivation Planning of Bondowoso - Prajekan Railway Line (KM 241+826 - KM 263+976)

Authors

  • Muhammad Raihan Nurdiansyah Indonesian Railway Polytechnic of Madiun
  • Wahyu Tamtomo Adi Indonesian Railway Polytechnic of Madiun
  • Adya Aghastya Indonesian Railway Polytechnic of Madiun

DOI:

https://doi.org/10.37367/jpi.v10i1.378

Keywords:

Kalisat - Panarukan railway, Railway Trace, Railway geometry, Autocad Civil 3d, Infraworks

Abstract

Railway reactivation is the reactivation of railway lines that are dead or have not been used for a long time to operate. Based on the 2030 National Railway Master Plan (RIPNAS). The purpose of this planning is to find out how the condition of the existing railway line that has not been operating since 2004, and re-plan the Bondowoso - Prajekan linta railway line In this reactivation planning using road class 1. This railroad planning changes the curvilinear radius according to the road class, which is> 780m. After analyzing the trajectory and calculating the next alignment designing the path using civil 3d software and infraworks The result of this study is that the trajectory used for reactivation planning is the existing trajectory with length 22+100. The survey results prove that the condition of the Bondowoso Station - Prajekan Station railway line has changed a lot into rice fields and residential areas, and the meterial conditions are not suitable for use. There are 13 Horizontal Curves and 11 Gradients for vertical curves.

Downloads

Download data is not yet available.

References

[1] Aldi Wardana Yudha, A. A. (2020). Perencanaan reaktivasi jalur kereta api lintas Madiun - Dalopo, 986-997.

[2] Kementerian Perhubungan Republik Indonesia. (n.d.). Rencana Induk Perkeretaapian Nasional KP 2128. Jakarta: Kementerian Perhubungan Republik Indonesia.

[3] Peraturan Dinas KA No.10. (n.d.). Perencanaan Kontruksi Jalan Rel. Bandung: PT. Kereta Api Indonesia (Persero).

[4] Peraturan Menteri Perhubungan No. 11. (2011). Tata Cara Penetapan Trase Jalur Kereta Api. Jakarta: Kementerian Perhubungan Republik Indonesia.

[5] Peraturan Menteri Perhubungan No. 60. (2012). Persyaratan Teknis Perkeretaapian. Jakarta: Kementerian Perhubungan Republik Indonesia.

[6] Pos, R. I. (2022, Desember 14). djka.dephub.go.id. Retrieved from https://djka.dephub.go.id/tetap-museum-atau-reaktivasi-jalur-ka

[7] Rosyidi, S. A. (2020). Rekayasa Jalan Kereta Api. Yogyakarta: Lembaga penelitian, publikasi dan pengabdian masyarakat Universitas Muhammadiyah Yogyakarta.

[8] Undang - Undang Nomor 23 Tahun 2007. (2007). Tentang Perkeretaapian. Jakarta: Kementerian Perhubungan Republik Indonesia.

[9] Utomo, S. H. (2006). Jalan Rel. Yogyakarta: Beta Offset Yogyakarta Perum FT-UGM Yogyakarta.

[10] Vendelstrand, L. &. (2017). Studi implementasi InfraWorks 360 bekerja sama dengan Revit dan AutoCAD Civil 3D Penggunaan BIM.

[11] Wahyu Abdul Aziz, A. A. (2020). Perencanaan Reaktivasi Jalur Kereta Api Lintas Dalopo - Surodikraman, 998-1008.

[12] H. Surakim, Konstruksi Jalan Rel dan Keselamatan Perjalanan Kereta Api. Badan Standardisasi Nasional, 2014. (Adya Aghastya, 2023)

[13] Wahyu Tamtomo Adi, A. A. (2022). Comparison of UAV Drone and Online Terrain Model for Railway Route Planning. Journal of Railway Transportation and Technology, 20-27. DOI: https://doi.org/10.37367/jrtt.v1i1.6

[14] Adya Aghastya, R. P. (2023). A New Geometric Planning Approach For Railroads Based . RESEARCH ARTICLE. DOI: https://doi.org/10.1063/5.0114225

Published

2026-04-09

Issue

Section

Articles

How to Cite

Muhammad Raihan Nurdiansyah, Tamtomo Adi, W., & Aghastya, A. (2026). Reactivation Planning of Bondowoso - Prajekan Railway Line (KM 241+826 - KM 263+976). Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 10(1), 30-41. https://doi.org/10.37367/jpi.v10i1.378

Most read articles by the same author(s)

1 2 > >>